Top Ten Software Testing MCQ – Software Testing Questions With Answers Quiz

Software Testing Questions With Answers Quiz: In this Exam You Can Practice Top Software Testing Ten MCQ for All Exam Like Diploma Degree Courses Quiz Type Software Question and Answers Available Here.

More quiz –

Software Testing Questions With Answers MCQ

1)   When an expected result is not specified in test case template then ___________.

a. We cannot run the test.

b. It may be difficult to repeat the test.

c. It may be difficult to determine if the test has passed or failed.

d. We cannot automate the user inputs.

c. It may be difficult to determine if the test has passed or failed.

2)   End result of Software Requirement Analysis is ________.

a. Functional and Behavioral

b. Architectural and Structural

c. Usability and Reliability

d. Algorithmic and Data Structure

a. Functional and Behavioral

Testing beyond normal operational capacity is __________.

a. Load testing

b. Performance testing

c. Stress testing

d. All of these.

c. Stress testing

The expected results of the software is _________________.

a. Only important in system testing

b. Only used in component testing

c. Most useful when specified in advance

d. Derived from the code.

a. Only important in system testing

Test cases are created in which phase?

a. Test Specification

b. Test Planning

c. Test Requirement

d. Test Configuration

a. Test Specification

A tester is executing a test to evaluate and it complies with the user requirement for a certain field be populated by using a dropdown box containing a list of values, at that time tester is performing __________ .

a. White-box Testing

b. Black-box Testing

c. Load Testing

d. Regression Testing

b. Black-box Testing

 7n test cases are generated in which case of Boundary Value Analysis?

a. Worst case

b. Roust worst case

c. Critical fault assumption

d. None of these

b. Roust worst case

Which testing is performed with Planning and Documentation?

a. Ad-hoc testing

b. Monkey testing

c. Fuzz testing

d. End-to-End testing

d. End-to-End testing

Which is not true regarding Spiral Model?

a. Risk analysis is involved in every cycle of development.

b. Uses series of prototype for refining test execution plan.

c. For any change we need to iterate the whole cycle.

d. Only this model has the risk analysis phase.

b. Uses series of prototype for refining test execution plan.

  ________ calls the function and passes it test data.

a. Test Stub

b. Test Driver

c. Proxy

d. None of the above

b. Test Driver

Leave a Comment